Lille Line 2

Almost in parallel with the Toulouse project, the Lille project was implemented between 1992 and 1994, with installation and commissioning in 5 stations.

Project PSD-F PSD-H total platform length [m] Implementation phase
Lille, Linie 2 60   520 1992 - 1994

26. June 2016

Between 1992 and 1994, and also virtually in parallel with the Toulouse project, a similar project involving 5 stations and 10 platforms has been installed and commissioned for Line 2 of the Lille metro system, with a total length of 520 m and with 60 bi-parting sliding doors.

Customer: Siemens SAS - France
Operator: Transpole