Select Market and Language

Please select the international website if your country is not listed.

By selecting the country, you will exit the actual site of the country. Please note that the entire product range is not available in all the countries!

Platform Screen Doors full-height (PSD-F)

The PSD full-height systems of Gilgen Door Systems AG come in two different versions. Depending on the customer’s requirements (for example in air-conditioned stations), his main focus may be on environmental consciousness and a judicial use of energy.
To cater to this need, we have designed the PSD full-height systems providing an air-tight screen in order to reduce the loss of energy in the air-conditioned passenger areas to an absolute minimum, but without compromising on the convenience and well-being of the passengers.

In northern areas where low temperatures are not uncommon, the heating aspect is of prime importance. As an option, the PSD systems can be equipped with heating elements in order to ensure a reliable functionality even when the temperatures are extremely low.

 
  • PSD full-height with airtight screen for air-conditioned stations
  • PSD full-height without an airtight screen
PSDF with airtight screen for air-conditioned stations
  • Hong Kong
  • New York, AirTrain JFK

PSDF with heated elements
  • New York, AirTrain JFK

PSDF without airtight screen
  • Toulouse Line A
  • Lille Line 2

MTR Hong Kong

  • Project: Hong Kong WIL, SIL, KTE Lines
  • Market Sector: Public transport
  • Realized: 2010 - 2015
More information about the reference

ST Electronics Singapore

  • Project: Guang Fo Line PSDF
  • Market Sector: Public transport
  • Realized: 2009 - 2012
More information about the reference

BBTC (Beijing Bracing Trading Company) Beijing Subway

  • Project: Beijing Chang Ping Line PSDF
  • Market Sector: Public transport
  • Realized: 2009 - 2010
More information about the reference

KTK Shentong Group

  • Project: Shanghai Line 2 West Extension
  • Market Sector: Public transport
  • Realized: 2008 - 2010
More information about the reference

KTK Shentong Group

  • Project: Shanghai Line 9 Phase 2 PSDF
  • Market Sector: Public transport
  • Realized: 2005 - 2008
More information about the reference

BBTC (Beijing Bracing Trading Company) Beijing Subway

  • Project: Beijing Olympic Sub Branch Line 10 PSDF
  • Market Sector: Public transport
  • Realized: 2006 - 2008
More information about the reference

KTK Shentong Group

  • Project: Shanghai Line 9 Phase 1 PSDF
  • Market Sector: Public transport
  • Realized: 2005 - 2008
More information about the reference

MTR Hong Kong

  • Project: Hong Kong Airport Express Line & TKS Line
  • Market Sector: Public transport
  • Realized: 2004 - 2005
More information about the reference

ST Electronics Singapore

  • Project: Taiwan - Kaoshiung Red & Orange Line
  • Market Sector: Public transport
  • Realized: 2003 - 2007
More information about the reference

ST Electronics Singapore

  • Project: Taiwan - Taipei - Muzha Line (Neihu)
  • Market Sector: Public transport
  • Realized: 2005 - 2006
More information about the reference

MTR Hong Kong

  • Project: Hong Kong KTL, TWL &ISL Lines
  • Market Sector: Public transport
  • Realized: 2000 - 2007
More information about the reference

Bombardier Tranaportation

  • Project: USA - New York AirTrain JFK, Betreiber Port Autority of NY
  • Market Sector: Public transport
  • Realized: 1998 - 2003
More information about the reference

Siemens SAS - France

  • Project: Lille, Linie 2, Métro Betreiber Transpole
  • Market Sector: Public transport
  • Realized: 1992 - 1994
More information about the reference

Siemens SAS- France

  • Project: Toulouse, Linie A, Métro Betreiber Tisséo
  • Market Sector: Public transport
  • Realized: 1991-1993, Phase 2, 2002-2004 3 Stationen
More information about the reference


Top